Keith
This is an artist's rendition of the completed
build
View from roof peak
Wall studs as seen from rear
Waiting for concrete footings for the steps to be added
Pier and steps will be poured soon
Guys arrive to pour cement
Pouring the pier
Pier cement finished.
There will be a 6" sand filled pier post on top to provide scope clearance and make up the additional height to the dome base.
The steps are in position
The dome's floor is in place
The dome's floor support structure is complete
The dome is in place
Ta-daaa....!
Now the hard part begins. All the equipment, wiring and calibrations need to begin.
His 10" Third Planet Optics RC Truss Scope and Losmandy G11 Mount is completed and on the pier
Keith